The olive mill wastewater is a major environmental problem, which is waiting for effective treatment. In this study, the
mineralization of olive mill wastewater was investigated using the electro/FeII/persulfate process. The central composite
design was utilized to examine the effect of each experimental variables (concentration of persulphate and FeII, treatment time and constant current) on the mineralization of olive mill wastewater. The optimum chemical oxygen demand
removal percentage was obtained as 71.2% where the reaction conditions were 200 mA current, 250 mM persulphate,
25 mM FeII, and 6 h reaction time. In addition, the maximum percentage of total phenolic removal and the energy consumption were 88% and 4.50 kWh/kgCOD, respectively, which were obtained at the same reaction ...